Skip to main content
Loading…
This section is included in your selections.

Upon completion of construction and prior to acceptance, the approved construction drawings shall be corrected to reflect “as-built” conditions, in accordance with the district’s general drafting standards, and shall be returned to the district. The record drawing submittal when approved shall include an electronic file on disk of the scanned “as-built” drawings, and the required signatures. For drawings created in electronic form, the submittal shall also include an AutoCAD file (Release 2010, Civil 3D or earlier version) “as-built” drawing information in accord with the district GIS provisions on disk, and all related “as-built survey” files. [Res. 735 § 1, 2017.]