Skip to main content
6.20.270 Cross connection protection.
This section is included in your selections.

Backflow assembly tests, certification and verification of locations, if applicable, shall be completed and reviewed by the district prior to project acceptance.

All on-site wells or auxiliary water systems shall be disconnected and decommissioned prior to connecting to the district’s water or sewer systems. Confirmation that the on-site wells have been decommissioned in accordance with WAC 173-160-381 shall be provided to the district prior to the district selling a water or sewer connection permit. [Res. 735 § 1, 2017.]

Loading…