Skip to main content
Loading…
This section is included in your selections.

The developer shall plan, design, and construct the sewer and/or water extension between the point of connection to the existing utility to and through the proposed development to provide sewer and/or water service to the developer’s property and to existing adjacent properties that can be served in accordance with the adopted district plans for future service. This extension includes mainlines to the far side of the property where future extension may occur. It also includes installing sewer laterals, water services, and fire hydrants in areas where water and sewer main improvements from the existing utility to the development are needed, as determined by the district, to serve existing properties along the alignment of the extension. [Res. 807 § 2 (Exh. 2), 2021.]